Basic works and pavement flexible Provincial Route No. 1 and No. 3

  • Completion: 2023
  • Client: Provincial Directorate of Chaco
  • Location: General Vedia Chaco (Argentina)

The work has a length of 15.60 km and consists in the execution of the basic work and in the construction of pavement flexible in the Provincial Routes # 1 and # 3, which linked the town of General Vedia Puerto Bermejo. It is a project of vital importance to strengthen the development of the Department Bermejo.

– Fitness hydraulics: project 5 sewers new, the extension of a sewer, existing, and the cleaning and desembanque of the rest. It is also necessary to perform two new bridges of concrete on the River Canguí Boy and Canguí Great in replacement of the current executed in hardwood.

– Urban paving in the village of “Puerto Bermejo”: the work includes the execution of about 1250 metres of pavement in urban and within the town with a typical profile of the avenue.

215.000 m3

embankment

19.200 tn

asphalt

5.800 m3

reinforced concrete

105.200 m2

asphalt used

– Length: 15,60 km
– Reinforced concrete: 5800 m3
– Sub-base soil treated with lime: 20800 m3
– Folder concreto asfaltico: 105200 m2
– Steel bars placed: 180 tn
– Embankments: 215000 m3
– Embankment with compacting special: 215000 m3
– Base of ground lime: 16300 m3
– Concrete for bridges: 1500 m3
– Driveway concrete for intersections: 800 m3
– Bridges: 2
– Cangüi large: 55 m
– Cangüi guy: 18 m