- VIALS

Mesh 534 – ruta nac n° 14 - splicing r. Prov n° 155 Stream cuay grande (pte +3.39) - currents

  • Completion: 2022
  • Client: National Directorate of Roads
  • Location: Alvear Corrientes (Argentina)

It is a work whose contract Maintenance and Recovery is developed on the Provincial Route N° 14 from the intersection with the Provincial Route N° 155 until the Stream Cuay Grande doing a total of 103,71 kilometers. With a term of 60 months calendar, during the first 36 tasks were developed recovery (patching deep, patching with asphaltic concrete, irrigation, league, folders, asphalt, banquinas, cleaning the ground, vertical and horizontal signaling and security elements). While the tasks of maintenance (grass cutting in banquinas, weeding sewer, defenses and signals, clearing sewers and drains) were performed simultaneously with recovery efforts from the start of the work until the end of the term.

101.200 m

length

2.050 m3

of embankment

– Replacement of soil in banquinas: 34750.00 m3
– Milling of existing pavement in 10mm thickness average: 131200 m2
– Irrigation of the season with bituminous material: 751850.00 m2
– Folder with mix bituminous concrete type asfaltico esp= 0.05 m: 322100.00 m2
– Sealing cracks and cracks with asphalt cured: 14975.00 m
– Sealing cracks and cracks with asphalt cured: 391300.00 m2
– Milling of existing pavement in 15mm thickness average: 216400.00 m2

– Folder with mix bituminous concrete type asfaltico esp= 0,04 m: 429700 m2
– Retirement and recolocacion of railings metal: 41580.00 m
– Patching surface: 1885.00 m3
– Bridges: 4
– Pte on rio aguapey – prog. 594.79: 158 m
– Pte. High-level f.c.g urquiza – prog. 603.23: 60 m
Pte. On cañada santa ana – prog. 611.62: 104 m
– Pte. On aroyo cuay grande – prog. 660.83: 156 m