– Opening of the arm of the river by dredging: 586.933 m3
– Fill with refulado free: 641.492 m3
Asphalt flexible: 40,000 m2
– Plant treatment of urban solid waste: 30 hectares
– Fill with refulado content: 517.537 m3
– Embankment of soil selected compact: 231.188 m3
– Channels rainwater coated: 20.000 m