– Transformer station 132/33/13.2 kv – 120/120/80mva – puerto vilela: 1
– Line of medium-voltage 33kv: 24 km
– Construction of foundations “legs apart”: 2.300 m3
– Assembly of structures metal freestanding: 125 a
– Assembly of a concrete structure, spin cycle: 19
– Laying of cables air of high and medium-voltage: 379.000 ml
– Construction of building shell and assembly of medium-voltage switchgear: 1 a
– Transformer installation 132/33/13.2 kv – 30/30/20mva: 2 a