– Length: 15,60 km
– Reinforced concrete: 5800 m3
– Sub-base soil treated with lime: 20800 m3
– Folder concreto asfaltico: 105200 m2
– Steel bars placed: 180 tn
– Embankments: 215000 m3
– Embankment with compacting special: 215000 m3
– Base of ground lime: 16300 m3
– Concrete for bridges: 1500 m3
– Driveway concrete for intersections: 800 m3
– Bridges: 2
– Cangüi large: 55 m
– Cangüi guy: 18 m