National Route No. 81. Mesh System C. Re.Ma 540

  • Completion: 2019
  • Client: National Directorate of Roads
  • Location: Ibarreta - Pozo del Mortero Formosa (Argentina)

It is a work whose contract Maintenance and Recovery is developed on the Provincial Route N° 14 from the intersection with the Provincial Route N° 155 until the Stream Cuay Grande doing a total of 103,71 kilometers. With a term of 60 months calendar, during the first 36 tasks were developed recovery (patching deep, patching with asphaltic concrete, irrigation, league, folders, asphalt, banquinas, cleaning the ground, vertical and horizontal signaling and security elements). While the tasks of maintenance (grass cutting in banquinas, weeding sewer, defenses and signals, clearing sewers and drains) were performed simultaneously with recovery efforts from the start of the work until the end of the term.

144 Has

Desbosque and cleaning

1.308.649 m2

Folder asphalt

47.663 m3

Banquinas

2.909 m3

Patching

– Patching deep with soil-cement: 1.610,75 m3
– Irrigation of the league: 1.145.298,00 m2
– Folder asphaltic concrete. E=0,04 m: 202.889,40 m2
– Banquinas of common ground: 47.663,68
– Pointing vertical: 170,50 m2
– Patching with asphaltic concrete: 1.299,69 m3
– Folder asphaltic concrete. E=0,03 m: 552.880,65 m2
– Const. Folder asphaltic concrete. E=0.05 m: 552.880,65 m2
– Desbosque and cleaning of the field: 144,45 has