– Fill density – controlled widening of the road: 2.579,58 m3
– Base aggregate stone and soil (stabilized granular): 82.467,00 m3
– Folder concreto asfaltico cac d19 (e=0.05): 593.803,06 m2
– Sub-base aggregate stone and floor (reconstruction): 85.680,00 m3
– Concrete Base asfaltico – cac d19 (thickness number): 612.004,54 m2
– Bridges: 2
– S/aº mocoretá
– S/aº yaguá – type z-500